During March, the clerestory carlines were finished, which involved setting six metal frames sandwiched between twelve carlines and bolted together then bolted to the top plate with the original hardware that was cleaned and repaired.

The apron bows were finished, faired and dove-tailed into the apron signboards.  Also, all 48 rafters and 44 carlines were planed fair and straightened with the top plate, end wall and apron bow.